OK
Danial Petro

COMPLETED PROJECTS

Construction of Ardestan and Kashan gas Compressor stations

Contractual Specifications:

  • Contract Date:

    1 January 2011

  • Contract Duration:

    24 months

  • Client:

    Iranian Gas Engineering and Development Company

  • Client Consultant:

    Peysang Consulting Company

  • Contract type:

    EPC

  • Contractor:

    Nasr Misagh Ahvaz and Setiran Company (Executed by Daniel Petro Company)

Brief description of the project:

Construction of two gas Compressor stations in Isfahan province called Ardestan and Kashan.

Construction of 12-inch pipeline for Persian Gulf Star Oil Refinery

Contractual Specifications:

  • Contract Date:

    22 November 2013

  • Contract Duration:

    6 months

  • Client:

    Persian Gulf Star Oil Company

  • Client Consultant:

    ---

  • Contract type:

    PC

  • Contractor:

    Danial Petro Company

Brief description of the project:

Preparation, supply and transportation of all goods and materials of the project (P) and construction and installation works (C) and commissioning and other services for all construction works, mechanical, gas injection and commissioning, one-year maintenance period of the project, temporary and the definitive delivery of the project for the construction of 12-inch Gas Pipeline at the entrance of the refinery (2.7 km) with pressure1050 Psi.

Construction of 36-inch pipeline to transfer gas condensate from Asaluyeh pump station to Bandar Abbas refinery

Contractual Specifications:

  • Contract Date:

    27 April 2008

  • Contract Duration:

    36 Months

  • Client:

    Persian Gulf Star Oil Company

  • Client Consultant:

    Middle East Energy Develop Company

  • Contract type:

    EPC

  • Contractor:

    Nasr Joint Venture (Jahad Nasr Kerman, Nasr Misagh Ahvaz, Setiran) and executed by Danial Petro Company.

Play Video

Brief description of the project:

Construction of 36-inch Pipeline (388 km) for transferring gas condensate to Asaluyeh-Bandar Abbas with approximate capacity of 500,000 barrels of gas condensate per day from the Asaluyeh pump station to the Bandar Abbas terminal and refinery for supply required feed of the refinery that it is expected to include:

  • Right of Way: 388 Km
  • Line Break valve(LBV): 7 Valves
  • Piping: 2167 M
  • Excavation: 13,000,000 M3
  • Launcher and receiver Station: 3 Stations
  • Pump Station (500,000 Barrels): 1 Station

Construction of 48-inch Shahroud- Sang Bast- Khangirian pipeline

Contractual Specifications:

  • Contract Date:

    29 October 2007

  • Contract Duration:

    24 Months

  • Client:

    Iranian Gas Engineering and Development Company

  • Client Consultant:

    Petro Farayand Energy Consulting Company

  • Contract type:

    PC

  • Contractor:

    Nasr Joint Venture (Jahad Nasr Kerman, Nasr Misagh Ahvaz, Ahvaz Pipe Industry Company and Sadid Company) and executed by Danial petro Company.

Brief description of the project:

This Project included:

  • Construction 48-inch Pipeline: 600 km
  • Excavation: 5,000,000 M3
  • LBV Station: 5 Stations
  • Launcher and receiver Station: 1 Station

Construction 20-inch Pipeline for transferring Products of Mahshahr Oil Warehouse

Contractual Specifications:

  • Contract Date:

    8 January 2015

  • Contract Duration:

    10 Months

  • Client:

    National Iranian Oil Engineering and Construction Company

  • Client Consultant:

    -

  • Contract type:

    PC

  • Contractor:

    Nasr Misagh Ahvaz Company (Procurement of the Project was performed by Danial Petro company)

Brief description of the project:

Performing services of supply of all materials and equipment of section (P) of 20-inch pipeline project for transferring Products of Noor bakhsh Oil Warehouse to Mahshahr export port, including:

  • Right of Way:13000 Km
  • Excavation: 100,000 M3
  • Piping: 13000 ML
  • Line Break Valve(LBV): 2 Stations and 1 Branch

Changing the thickness of the 40-inch Paresar-Astara pipeline

Contractual Specifications:

  • Contract Date:

    12 October 2015

  • Contract Duration:

    195 days

  • Client:

    National Iranian Oil Engineering and Construction Company

  • Client Consultant:

    Ostova Consulting Company

  • Contract type:

    PC

  • Contractor:

    Nasr Misagh Ahvaz Company (Executing by Danial Petro)

Play Video

Brief description of the project:

Construction of 8.8 km of the first 40-inch national gas pipeline between Paresar and Astara in six scattered sections.

Abadan 36-inch and southeast of Ahvaz 24-inch gas pipeline deepening project in intersection with Ahvaz -Mahshahr water supply channel to control fine dust

Contractual Specifications:

  • Contract Date:

    4 July 2017

  • Contract Duration:

    1 Months

  • Client:

    Jahad Nasr Institute

  • Client Consultant:

    Sazab Pardazan Consulting Company

  • Contract type:

    C

  • Contractor:

    Danial Petro company

Brief description of the project:

Executive Operations is the replacement of about 100 meters of 36-inch existing pipe and100 meters of 24-inch low-thickness pipe with new pipes and lowering the pipe to depth of 6 meters below the water supply channel of the fine dust control Program.

Construction of 30-inch Gas Pipeline in Bandar Abbas

Contractual Specifications:

  • Contract Date:

    19 August 2014

  • Contract Duration:

    9 Months

  • Client:

    National Iranian Oil Engineering and Construction Company

  • Client Contractor:

    Farayand Sazan Energy Company

  • Contractor:

    Nasr Misagh Ahvaz (Executed by Danial Petro Company)

Play Video

Brief description of the project:

Gas supply to Bandar Abbas refinery and relevant industries along the route include:

  • Procurement and supply of all materials, equipment and spare parts (P), construction and installation works (C)
  • Construction of about 32 km of 30-inch pipeline branched from the seventh national line near Bandar Abbas
  • Construction Access way
  • Construction LBV station and Pressure Control station and Launcher and receiver station

Continuation of 30-inch gas pipeline in Bandar Abbas

Contractual Specifications:

  • Contract Date:

    28 June 2016

  • Contract Duration:

    6 Months

  • Client:

    National Iranian Oil Engineering and Construction Company

  • Client Consultant:

    Farayand Sazan Energy Company

  • Contract type:

    C

  • Contractor:

    Nasr Misagh Ahvaz (Executed by Danial Petro Company)

Brief description of the project:

  • Gas supply to Bandar Abbas refinery and relevant industries along the route
  • Construction of about 7 km of 30-inch pipeline branched from the seventh national line near Bandar Abbas
  • Construction LBV Station and Receiver Station

Construction of Shahroud Airport refueling facilities

Contractual Specifications:

  • Contract Date:

    7 October 2017

  • Contract Duration:

    12 Months

  • Client Contractor:

    National Iranian Fuel Products Distribution Company

  • Contract Type:

    PC

  • Contractor:

    Danial Petro Company

Play Video

Brief description of the project:

  • Supply Materials and Equipment
  • Electricity and instrumentation
  • Mechanical that includes the supply and delivery of goods, implementation and commissioning of air fuel piping system and refueling facilities, construction of pumping stations for unloading and loading and construction of tanks and firefighting of air fuel tanks and unloading and loading points of tankers and refueler.
  • painting and Protection from corrosion
  • Installation, Operation and Commissioning